Surge Damage — The Most Common Motor Fault in Gauteng
National load shedding has been suspended since 2025, but Gauteng still loses power — to scheduled load reduction in affected suburbs, cable theft, substation faults and summer storms. In almost every motor we're called out to afterwards, the damage wasn't done while the power was off. It was done in the instant it came back, when the voltage spike reached an unprotected control board.
Common repairs and warning signs
- Control board diagnosed, then repaired or replaced depending on which is the better value
- Surge protection fitted after every board repair, so the fault doesn't come back
- Backup battery tested at the same visit — a battery that failed during the outage often hides a second fault behind it
- Remaining components checked for heat damage before the repair is signed off